Author
Alwesabi, Y., Avishan, Farzad, Yanıkoğlu, İhsan, Liu, Z., Wang, Y.
Publication Date
2022-02-01
Publication Place
-
Elsevier
Subject
Battery electric bus, Dynamic wireless charging, Electromobility, Robust optimization, Vehicle scheduling
Type
Periodical
Language
English
Digital
Yes
Manuscript
No
Library
Özyeğin University
Library Asset ID
0306-2619
Record ID
ba9443bd-6315-4016-b5e9-a9f258467573
Library Location
Industrial Engineering
Date
2022-02-01
Sample Text
Electromobility in public bus systems is growing rapidly and experiencing a fundamental transformation in their infrastructure and operations. The dilemma of limited driving range and charging time of battery electric buses (BEBs) hinders their adoption. A novel approach to address BEB limitations is to utilize dynamic wireless charging (DWC) technology that allows buses to charge while in motion. This paper aims to analyze robust strategic planning of DWC and BEB fleet scheduling based on a real bus network at Binghamton University. The problem is first formulated as a new deterministic mixed-integer linear programming model to simultaneously optimize both the charging planning problem and fleet scheduling problem in an integrated fashion. To address the uncertainty of energy demand and charging time, a robust counterpart model (RCM) has been derived. To increase RCM flexibility, the battery status variable is formulated in a cumulative form. Dependent and independent budget uncertainty sets have been developed to control the robustness. A sensitivity analysis has been conducted to study the system behavior in response to different charging types, auxiliary energy demand, depth of discharge, charging options at terminals, battery degradation, and electricity cost. The deterministic model shows that eight homogeneous BEBs are required to operate on the selected routes with a battery capacity of 54.01 kWh and a total cost of $3,636,347. The results show that joint planning of charging infrastructure and fleet scheduling can save 19.2% of total cost compared to disjoint planning. The RCM results in 10 BEBs to ensure feasiblility against uncertainty.
DOI
10.1016/j.apenergy.2021.118243
Cilt
307