Multi-stage scenario-based stochastic programming for managing lot sizing and workforce scheduling at Vestel

Title Multi-stage scenario-based stochastic programming for managing lot sizing and workforce scheduling at Vestel
Author Seyfishishavan, Seyed Amin, Yanıkoğlu, İhsan, Yılmaz, G.
Publication Date: 2023-12
Publication Place - Springer
Subject Multi-stage decision making, Production planning, Stochastic programming, Workforce scheduling
Type Periodical
Language English
Digital Yes
Manuscript No
Library: Özyeğin University
Library Asset ID 0254-5330
Record ID 09196880-a7cb-4738-9f3c-f7e66a4a86e3
Library Location Industrial Engineering
Date 2023-12
Notes TÜBİTAK
Sample Text This study proposes a multi-stage stochastic production planning approach for a joint lot sizing and workforce scheduling problem under demand uncertainty. Scenario trees are used to model uncertainty in demand, and a multi-stage scenario-based stochastic linear program is developed. This model allows for both here-and-now and wait-and-see decisions providing flexibility for decision-makers to adjust production quantities according to the realized portion of demand and improve the overall effectiveness of production planning by better managing the number of active lines, workforce, and inventory levels. A matheuristic is developed for large-sized instances, which yields near-optimal solutions in practicable computation times. The proposed methods are demonstrated over a real data set taken from a Turkish home and professional appliances company, Vestel. The results show significant improvements in cost and CPU time performances for benchmark approaches, verifying the effectiveness of the proposed method.
DOI 10.1007/s10479-023-05741-4
View in source Özyeğin University Özyeğin University - Historical works, archives, and periodicals search engine
Özyeğin University - Historical works, archives, and periodicals search engine Özyeğin University

Multi-stage scenario-based stochastic programming for managing lot sizing and workforce scheduling at Vestel

Author Seyfishishavan, Seyed Amin, Yanıkoğlu, İhsan, Yılmaz, G.
Publication Date 2023-12
Publication Place - Springer
Subject Multi-stage decision making, Production planning, Stochastic programming, Workforce scheduling
Type Periodical
Language English
Digital Yes
Manuscript No
Library Özyeğin University
Library Asset ID 0254-5330
Record ID 09196880-a7cb-4738-9f3c-f7e66a4a86e3
Library Location Industrial Engineering
Date 2023-12
Notes TÜBİTAK
Sample Text This study proposes a multi-stage stochastic production planning approach for a joint lot sizing and workforce scheduling problem under demand uncertainty. Scenario trees are used to model uncertainty in demand, and a multi-stage scenario-based stochastic linear program is developed. This model allows for both here-and-now and wait-and-see decisions providing flexibility for decision-makers to adjust production quantities according to the realized portion of demand and improve the overall effectiveness of production planning by better managing the number of active lines, workforce, and inventory levels. A matheuristic is developed for large-sized instances, which yields near-optimal solutions in practicable computation times. The proposed methods are demonstrated over a real data set taken from a Turkish home and professional appliances company, Vestel. The results show significant improvements in cost and CPU time performances for benchmark approaches, verifying the effectiveness of the proposed method.
DOI 10.1007/s10479-023-05741-4
Özyeğin University - Historical works, archives, and periodicals search engine
Özyeğin University You are being redirected...

Please wait