Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance

Title Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance
Author Göçer, Özgür, Hua, Y., Göçer, K.
Publication Date: 2015-07
Publication Place - Elsevier
Subject Building performance, Feedback, Post-occupancy evaluation, Stakeholders, BIM, GIS
Type Periodical
Language English
Digital Yes
Manuscript No
Library: Özyeğin University
Library Asset ID 0360-1323
Record ID 61ebb429-f9eb-483d-b5c7-ba270bab6bdc
Library Location Architecture
Date 2015-07
Notes Due to copyright restrictions, the access to the full text of this article is only available via subscription.
Sample Text This paper provides a review of the improvements in the evaluation of building performance and introduces a new method for post-occupancy evaluation (POE) to complete the missing link in the building design process. Existing studies were reviewed to understand the possible reasons for the missing link of “building performance feedback”. The intention of this paper is to set out a new vision for how future post-occupancy evaluation can close the building performance feedback loop to better inform building design. The spatial mapping method adopted extends the use of building information modeling (BIM), which has shown great potential for the future of the Architecture, Engineering and Construction (AEC) industry, and uses geographical information systems (GIS), which is a powerful tool for analyzing and visualizing relationships between geographical units and their data. This study explores how to establish a communication platform for different stakeholders in order to engage them in the collaborative effort of continuous building performance improvement by using the results of POE embedded into BIM. In this paper, the experiences of a POE study of a LEED® Platinum building and a historical building on a university campus are reported as examples to illustrate the proposed new method.
DOI 10.1016/j.buildenv.2015.02.011
Cilt 89
View in source Özyeğin University Özyeğin University - Historical works, archives, and periodicals search engine
Özyeğin University - Historical works, archives, and periodicals search engine Özyeğin University

Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance

Author Göçer, Özgür, Hua, Y., Göçer, K.
Publication Date 2015-07
Publication Place - Elsevier
Subject Building performance, Feedback, Post-occupancy evaluation, Stakeholders, BIM, GIS
Type Periodical
Language English
Digital Yes
Manuscript No
Library Özyeğin University
Library Asset ID 0360-1323
Record ID 61ebb429-f9eb-483d-b5c7-ba270bab6bdc
Library Location Architecture
Date 2015-07
Notes Due to copyright restrictions, the access to the full text of this article is only available via subscription.
Sample Text This paper provides a review of the improvements in the evaluation of building performance and introduces a new method for post-occupancy evaluation (POE) to complete the missing link in the building design process. Existing studies were reviewed to understand the possible reasons for the missing link of “building performance feedback”. The intention of this paper is to set out a new vision for how future post-occupancy evaluation can close the building performance feedback loop to better inform building design. The spatial mapping method adopted extends the use of building information modeling (BIM), which has shown great potential for the future of the Architecture, Engineering and Construction (AEC) industry, and uses geographical information systems (GIS), which is a powerful tool for analyzing and visualizing relationships between geographical units and their data. This study explores how to establish a communication platform for different stakeholders in order to engage them in the collaborative effort of continuous building performance improvement by using the results of POE embedded into BIM. In this paper, the experiences of a POE study of a LEED® Platinum building and a historical building on a university campus are reported as examples to illustrate the proposed new method.
DOI 10.1016/j.buildenv.2015.02.011
Cilt 89
Özyeğin University - Historical works, archives, and periodicals search engine
Özyeğin University You are being redirected...

Please wait