Author
Coban, Elvin, Ozener, O. Orsan, Selcuk, Yagmur Selenay, Elyasi, Milad
Publication Date
2024-03
Publication Place
-
Elsevier
Subject
Sequence-and-machine-dependent setup times, Machine-job compatibility, Machine workload, Unrelated parallel machine scheduling, Imperialist competitive algorithm
Type
Periodical
Language
English
Digital
Yes
Manuscript
No
Library
Özyeğin University
Library Asset ID
0360-8352
Record ID
3736bfbf-8ec5-49bb-9d7b-677dee7ebc6d
Library Location
Industrial Engineering
Date
2024-03
Sample Text
In this paper, we present an in-depth analysis of the unrelated parallel machine scheduling problem (UPMSP) in the context of washing machine production at Vestel Electronics. Vestel Electronics is a leading producer of washing machines and holds a noteworthy market position in the European consumer electronics industry. The production process at Vestel Electronics is make-to-order (MTO) and requires 20 assembly lines to produce 200 different products. The decision maker must consider several important factors while forming the production schedule, including job-assembly line compatibility, the release times and due dates of the jobs, and a workload balance among the different assembly lines. This study aims to develop an algorithm to minimize the total earliness and tardiness while considering sequence-and-machine-dependent setups, unequal release times, machine -job compatibility restrictions, and workload balance requirements. To address this complex scheduling problem, we propose a novel algorithm, the imperialist competitive algorithm (ICA), which has a strong exploration-exploitation balance while mimicking real-world dynamics. Our numerical results show that the ICA significantly outperforms the current practice in Vestel by 39% and the best-performing algorithms in the literature by 23% and 12%.
DOI
10.1016/j.cie.2024.110086
Cilt
190