front side of the plan

Title front side of the plan
Publication Date: 05-28-1928
Subject Ankara Law School Deed--Plan
Type Book
Language Ottoman
Digital Yes
Manuscript No
Physical Dimensions 1/100 ölçekli.
Library: Koç University Digital Collections
Record ID 1495
Library Location Vehbi Koç Collection
Date 05-28-1928
Notes The documents include a 1/100 scale basement plan and copy of Ankara Law School. There is a fifteen-cent stamp on the plan, dated March 19, 1928, with the signatures of Contractor Mustafa Cemal and former General Manager Rüştü Bey. On the back of the project, it is written that on May 28, 1928, the Accounting Examiner of Evkaf Directorate General and the construction examiner certified and testified that the signatures on the project belonged to former General Manager Rüştü Bey and Contractor Engineer Mustafa Cemal Bey, and it was approved by the second notary public in Ankara.
Dijitalleştirme Tarihi 2016
Doküman Türü Proje
Envanter No V037_01
Format Image/JPEG
İndirilen Görseller images/1495/.jpg, images/1495/.jpg, images/1495/.jpg, images/1495/V037_01.jpg, images/1495/V037_02.jpg, images/1495/V037_Transcription.jpg
View in source Koç University Digital Collections Koç University Digital Collections - Ottoman library catalog search
Koç University Digital Collections - Ottoman library catalog search Koç University Digital Collections

front side of the plan

Publication Date 05-28-1928
Subject Ankara Law School Deed--Plan
Type Book
Language Ottoman
Digital Yes
Manuscript No
Physical Dimensions 1/100 ölçekli.
Library Koç University Digital Collections
Record ID 1495
Library Location Vehbi Koç Collection
Date 05-28-1928
Notes The documents include a 1/100 scale basement plan and copy of Ankara Law School. There is a fifteen-cent stamp on the plan, dated March 19, 1928, with the signatures of Contractor Mustafa Cemal and former General Manager Rüştü Bey. On the back of the project, it is written that on May 28, 1928, the Accounting Examiner of Evkaf Directorate General and the construction examiner certified and testified that the signatures on the project belonged to former General Manager Rüştü Bey and Contractor Engineer Mustafa Cemal Bey, and it was approved by the second notary public in Ankara.
Dijitalleştirme Tarihi 2016
Doküman Türü Proje
Envanter No V037_01
Format Image/JPEG
İndirilen Görseller images/1495/.jpg, images/1495/.jpg, images/1495/.jpg, images/1495/V037_01.jpg, images/1495/V037_02.jpg, images/1495/V037_Transcription.jpg
Koç University Digital Collections - Ottoman library catalog search
Koç University Digital Collections You are being redirected...

Please wait