front side of the plan

Title front side of the plan
Publication Date: 03-31-1928
Subject Deed--Plan Ankara Law School
Type Book
Language Ottoman
Digital Yes
Manuscript No
Physical Dimensions 1/100 ölçekli.
Library: Koç University Digital Collections
Record ID 1429
Library Location Vehbi Koç Collection
Date 03-31-1928
Notes Documents are the 1/100 scale façade project of Ankara Law School. On the project, the façade of the Law School, which will be renovated when it was the first school in the Fire Brigade Square, is 1/100 meters long, with the signature of 31 March 1928 Engineer Mustafa Cemal, Principal General Rüştü Bey and a fifteen-cent stamp stamp underneath. Behind the project, on May 28, 1928, the accounting examiner of the General Directorate of Foundations and the construction examiner confirmed and testified that the signatures on the project belonged to the former general manager Rüştü Bey and the engineer Mustafa Cemal Bey, and it was approved by the Ankara Second Chief Justice (Notary).
Dijitalleştirme Tarihi 2016
Doküman Türü Proje
Envanter No V039_01
Format Image/JPEG
İndirilen Görseller images/1429/.jpg, images/1429/.jpg, images/1429/V039_01.jpg, images/1429/V039_02.jpg
View in source Koç University Digital Collections Koç University Digital Collections - Ottoman library catalog search
Koç University Digital Collections - Ottoman library catalog search Koç University Digital Collections

front side of the plan

Publication Date 03-31-1928
Subject Deed--Plan Ankara Law School
Type Book
Language Ottoman
Digital Yes
Manuscript No
Physical Dimensions 1/100 ölçekli.
Library Koç University Digital Collections
Record ID 1429
Library Location Vehbi Koç Collection
Date 03-31-1928
Notes Documents are the 1/100 scale façade project of Ankara Law School. On the project, the façade of the Law School, which will be renovated when it was the first school in the Fire Brigade Square, is 1/100 meters long, with the signature of 31 March 1928 Engineer Mustafa Cemal, Principal General Rüştü Bey and a fifteen-cent stamp stamp underneath. Behind the project, on May 28, 1928, the accounting examiner of the General Directorate of Foundations and the construction examiner confirmed and testified that the signatures on the project belonged to the former general manager Rüştü Bey and the engineer Mustafa Cemal Bey, and it was approved by the Ankara Second Chief Justice (Notary).
Dijitalleştirme Tarihi 2016
Doküman Türü Proje
Envanter No V039_01
Format Image/JPEG
İndirilen Görseller images/1429/.jpg, images/1429/.jpg, images/1429/V039_01.jpg, images/1429/V039_02.jpg
Koç University Digital Collections - Ottoman library catalog search
Koç University Digital Collections You are being redirected...

Please wait