The memorandum written to the Grand Vizier about ordering the City to arrange the square pavements on both sides of the bridge according to the condition of the bridge, as the construction of the iron bridge between Eminönü and Karaköy is nearing completion.
| Title | The memorandum written to the Grand Vizier about ordering the City to arrange the square pavements on both sides of the bridge according to the condition of the bridge, as the construction of the iron bridge between Eminönü and Karaköy is nearing completion. |
|---|---|
| Publication Date: | 9 L. 1292 |
| Subject | Tezkire Construction works Transportation, Bridges |
| Type | Other |
| Language | Ottoman |
| Digital | Yes |
| Manuscript | No |
| Physical Dimensions | 1 evrak; soğuk damgalı; 382x230 mm. |
| Library: | Istanbul Metropolitan Municipality Libraries |
| Library Asset ID | PVS_Evr_03683 |
| Record ID | 2752639 |
| Library Location | IMM Ataturk Library |
| Date | 9 L. 1292 |
| Yayın Geliş Tarihi | 8.10.2013 |