Restriction - construction of mosques

Title Restriction - construction of mosques
Publication Date: 24/03/1898 — 01/11/1315
Publication Place Al-Qarawiyyin (Fez) -
Subject Construction of mosques
Type Document
Language Arabic
Digital Yes
Manuscript No
Library: King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences
Record ID display10470
Library Location Al-Qarawiyyin (Fez)
Date 24/03/1898 — 01/11/1315
Notes A list of what the Superintendent of Al-Qarawiyyin received regarding their supplies and necessities, along with what was added to them from the mosques in the sacred month of Qa’dah in the year 1315: 10 of it in the wages of a qanwi, a craftsman, two servants, a utensil, a pound of oil 15, sheets, a drain, and half a quintal of lime, a load, and sand, all for repairing the mosques of Darb Al-Tawil and Darb Al-Khattar, 254 in the wages of builders and a service in 7 of it, 4 carpenters, 98, and two loads with A chisel, nails, and poles, 59, a drain of 21, and a sander, of 15, in Al-Sharabelin Mosque, 442, in the rent for two servants, a load of tiles, tiles, rent, a net, a chisel, a chisel, and the price of 400, a vase, a drain, lime, and a sandbox, 44, in Abu Maimouna’s office, 378, in the rent of two masons, 180 servants, a pile of 6/125, and rakes. 406, and more than one pile of wood and a load of wood, and a drain 21, and the price of lime 12, and the price of 32, a reward for each in a nest hotel, and the price of 8 pigeons in his houses 168   1742 in construction fees, in the wages of carpenters, a pound of nails, and the fee for sawing threads 18 in total, p. 237, and two servants, a gutter, and a drain 21, and a lime for 1, and a sandbox 3, all with the hand of digging it up, and it was gathered together. In Al-Bastiwi, Ajisa 182 in the wages of a construction teacher, service, and rental of an axe, mesh, rope, and traps 3 and a wool holder 2 to repair the city wall in Al-Qayba 247 in the price of a large chicken, the number of intercourse, imprisonment in Basios 0049 in the wages of the carpenter’s supervisor and the prison agent 105 in carrying the residence permit for the above places 988 Al-Murabitan Al-Afdal, vol. 3589
View in source King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences - Historical works, archives, and periodicals search engine
King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences - Historical works, archives, and periodicals search engine King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences

Restriction - construction of mosques

Publication Date 24/03/1898 — 01/11/1315
Publication Place Al-Qarawiyyin (Fez) -
Subject Construction of mosques
Type Document
Language Arabic
Digital Yes
Manuscript No
Library King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences
Record ID display10470
Library Location Al-Qarawiyyin (Fez)
Date 24/03/1898 — 01/11/1315
Notes A list of what the Superintendent of Al-Qarawiyyin received regarding their supplies and necessities, along with what was added to them from the mosques in the sacred month of Qa’dah in the year 1315: 10 of it in the wages of a qanwi, a craftsman, two servants, a utensil, a pound of oil 15, sheets, a drain, and half a quintal of lime, a load, and sand, all for repairing the mosques of Darb Al-Tawil and Darb Al-Khattar, 254 in the wages of builders and a service in 7 of it, 4 carpenters, 98, and two loads with A chisel, nails, and poles, 59, a drain of 21, and a sander, of 15, in Al-Sharabelin Mosque, 442, in the rent for two servants, a load of tiles, tiles, rent, a net, a chisel, a chisel, and the price of 400, a vase, a drain, lime, and a sandbox, 44, in Abu Maimouna’s office, 378, in the rent of two masons, 180 servants, a pile of 6/125, and rakes. 406, and more than one pile of wood and a load of wood, and a drain 21, and the price of lime 12, and the price of 32, a reward for each in a nest hotel, and the price of 8 pigeons in his houses 168   1742 in construction fees, in the wages of carpenters, a pound of nails, and the fee for sawing threads 18 in total, p. 237, and two servants, a gutter, and a drain 21, and a lime for 1, and a sandbox 3, all with the hand of digging it up, and it was gathered together. In Al-Bastiwi, Ajisa 182 in the wages of a construction teacher, service, and rental of an axe, mesh, rope, and traps 3 and a wool holder 2 to repair the city wall in Al-Qayba 247 in the price of a large chicken, the number of intercourse, imprisonment in Basios 0049 in the wages of the carpenter’s supervisor and the prison agent 105 in carrying the residence permit for the above places 988 Al-Murabitan Al-Afdal, vol. 3589
King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences - Historical works, archives, and periodicals search engine
King Abdul-Aziz Al Saoud Foundation for Islamic Studies and Human Sciences You are being redirected...

Please wait