Memorandum stating that the Ministry of Public Works has notified that the height of the head of the bridge between Eminönü and Karaköy on the Istanbul side can only be lowered by 30 cm and therefore the pavements in front of the Pertevniyal Valide Sultan Foundation buildings there must be rebuilt.
| Title | Memorandum stating that the Ministry of Public Works has notified that the height of the head of the bridge between Eminönü and Karaköy on the Istanbul side can only be lowered by 30 cm and therefore the pavements in front of the Pertevniyal Valide Sultan Foundation buildings there must be rebuilt. |
|---|---|
| Publication Date: | 25 Ra. 1293 |
| Type | Document |
| Language | Ottoman |
| Digital | Yes |
| Manuscript | No |
| Library: | Istanbul Metropolitan Municipality Libraries |
| Library Asset ID | PVS_Evr_04371 |
| Record ID | PVS_Evr_04371 |
| Date | 25 Ra. 1293 |
| Notes | Cold stamp: Şehremaneti |