Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects

İsim Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects
Yazar Ozkan, Selen, Seyis, Senem
Basım Tarihi: 2024-08-01
Basım Yeri - ASCE
Konu Delphi method, Digitalization, Information management, Information and communications technology (ict), Common data environment (cde), Building information modeling
Tür Süreli Yayın
Dil İngilizce
Dijital Evet
Yazma Hayır
Kütüphane: Özyeğin Üniversitesi
Demirbaş Numarası 0733-9364
Kayıt Numarası 2340b8a3-f9eb-4692-83ee-f5e7b1a9a90c
Lokasyon Civil Engineering
Tarih 2024-08-01
Örnek Metin This research aims to identify, categorize, and prioritize the benefits and challenges of implementing common data environments (CDEs) in the construction phase of building information modeling (BIM)-based projects. For this purpose, a systematic literature review, semistructured interviews, and the Delphi method were conducted, and online sources of CDE providers were investigated. 54 benefits and 15 challenges were identified. Cronbach's alpha, standard deviation, interrater agreement level, and significance level statistics were calculated to analyze and validate Delphi method outputs. Results demonstrate that the most important benefit of implementing CDEs in the construction phase of BIM-based projects is access to accurate, reliable, up-to-date information. The most critical challenge is the exclusion of CDE planning in the front-end phase of the project. Prioritizing the benefits shows CDEs' full potential for the construction phase of BIM-based projects. Prioritizing the challenges demonstrates possible future works, requirements, and the areas that should be improved. This research provides a comprehensive point of view on the benefits and challenges of implementing CDEs in the construction phase of BIM-based projects. It analyzes the potential of CDEs by strengthening the findings from the systematic literature review with the SMEs' evaluation, comments, and feedback. This study provides valuable insights into implementing CDEs in the construction phase of BIM-based projects, defining their capabilities, status, and potential, and giving suggestions about how to deal with their challenges. This research shows how CDEs ensure streamlining information and communication flows in BIM-based projects by mitigating nonvalue-added activities resulting from informal, nonstandardized data exchanges, lack of proper data exchange protocols, loss of project data, and lack of efficient collaboration and communication between project team participants. This study reveals the importance of implementing CDEs in the construction phase of BIM-based projects to achieve adequate information and communication management that may prevent project data loss, informal, nonstandardized data exchanges, and inefficient collaboration between multidisciplinary teams.
DOI 10.1061/JCEMD4.COENG-14133
Cilt 150
Kaynağa git Özyeğin Üniversitesi Özyeğin Üniversitesi
Özyeğin Üniversitesi Özyeğin Üniversitesi
Kaynağa git

Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects

Yazar Ozkan, Selen, Seyis, Senem
Basım Tarihi 2024-08-01
Basım Yeri - ASCE
Konu Delphi method, Digitalization, Information management, Information and communications technology (ict), Common data environment (cde), Building information modeling
Tür Süreli Yayın
Dil İngilizce
Dijital Evet
Yazma Hayır
Kütüphane Özyeğin Üniversitesi
Demirbaş Numarası 0733-9364
Kayıt Numarası 2340b8a3-f9eb-4692-83ee-f5e7b1a9a90c
Lokasyon Civil Engineering
Tarih 2024-08-01
Örnek Metin This research aims to identify, categorize, and prioritize the benefits and challenges of implementing common data environments (CDEs) in the construction phase of building information modeling (BIM)-based projects. For this purpose, a systematic literature review, semistructured interviews, and the Delphi method were conducted, and online sources of CDE providers were investigated. 54 benefits and 15 challenges were identified. Cronbach's alpha, standard deviation, interrater agreement level, and significance level statistics were calculated to analyze and validate Delphi method outputs. Results demonstrate that the most important benefit of implementing CDEs in the construction phase of BIM-based projects is access to accurate, reliable, up-to-date information. The most critical challenge is the exclusion of CDE planning in the front-end phase of the project. Prioritizing the benefits shows CDEs' full potential for the construction phase of BIM-based projects. Prioritizing the challenges demonstrates possible future works, requirements, and the areas that should be improved. This research provides a comprehensive point of view on the benefits and challenges of implementing CDEs in the construction phase of BIM-based projects. It analyzes the potential of CDEs by strengthening the findings from the systematic literature review with the SMEs' evaluation, comments, and feedback. This study provides valuable insights into implementing CDEs in the construction phase of BIM-based projects, defining their capabilities, status, and potential, and giving suggestions about how to deal with their challenges. This research shows how CDEs ensure streamlining information and communication flows in BIM-based projects by mitigating nonvalue-added activities resulting from informal, nonstandardized data exchanges, lack of proper data exchange protocols, loss of project data, and lack of efficient collaboration and communication between project team participants. This study reveals the importance of implementing CDEs in the construction phase of BIM-based projects to achieve adequate information and communication management that may prevent project data loss, informal, nonstandardized data exchanges, and inefficient collaboration between multidisciplinary teams.
DOI 10.1061/JCEMD4.COENG-14133